‘File 28/1 K I Defence of oil field and refinery’ [‎262r] (523/684)

This item is part of

The record is made up of 1 file (340 folios). It was created in 5 Dec 1939-3 May 1942. It was written in English. The original is part of the British Library: India Office The department of the British Government to which the Government of India reported between 1858 and 1947. The successor to the Court of Directors. Records and Private Papers Documents collected in a private capacity. .

Transcription

This transcription is created automatically. It may contain errors.

Apply page layout

5 Cf ^
H«port on P*AJ) # meaaar^ In Ih* oil Coy oroa
BAHRAIN*
!• The Coy operate under black out conditions*
£. Healdantial area and coolie A term used to describe labourers from a number of Asian countries, now considered derogatory. caiaps*
(a) Air raid shelters have been built to accommodate all
personnel. The specifications and design of the
shelters have been approved by O.H.Q. INDIA.
(b) Instruction In first »id measures la given to the
employees.
(c) First aid equipment is provided by the Coy and earmarked
for all areas.
3. Fields area.
(a) Personnel, only X men live in the fields area, these
men should be provided for %*ith slit trenches.
£
(b) Wells. The eight most important wells have sub-surface
rotectlon.
e remaining working wells have sand bag and reinforced
concrete protection st the well heads.
Automatic excsss velocity shut down valves are provided in
58 of the walls. These valves shut off the flow of oil
in the evjnt of any damage securing at the well head.
(o) Tank batteries have pot been protected, they are not
considered to be a worth while target for air attack
and are not aaaentlal to the running of the plant.
4. Tha refinery and tank farm.
(a) This ares Is very compact having been designed for
operation by the minimum number of personnel operating under
peace time conditions.
The construction of adequate P.A.D. measures is
difficult for reasons given in para 5 below.
(b) Two reinforced concrete shelters and 12 open sand bagged
shelters have been provided.
The high sub soil water level in this area precludes
the construction of slit trenches.
The Company agree to construct a third reinforced
concrete Shelter in the area between the crocking and
acid plants.
They also agreed to re-construct all sand bag shelters.
(c) Fire fighting appliances are being dealt with in a
special report by Cept. Bradford.
The following is a brief resume of the chief points
brought out.
The existing appliances are adaquate for paace time
operation but not for operation under war conditions.
There is s 6* water main throughout tha fields area but
fire hydrants are only 1} inch.
The Coy agreed to replacing the existing pipes with 4"
Fisers and two 2 > hydrants to serve the tank batteries.
80.000 lbs of foam powder la now available, more has
been ordered and tha coy wish to procure at least 160,000 Ibi
Two foam towers exist and two more are being made.
The intention is to have one foam tower at ZSL1AQ one
at 3ITRA and TWO in the main tank farm.

About this item

Content

The file comprises copies of correspondence, memoranda and reports relating to the military defence of Bahrain’s oil refineries and oil fields during the Second World War. The principal correspondents in the file are: the Political Agent A mid-ranking political representative (equivalent to a Consul) from the diplomatic corps of the Government of India or one of its subordinate provincial governments, in charge of a Political Agency. in Bahrain (Hugh Weightman; Major Reginald George Evelin William Alban); the Chief Local Representative of the Bahrain Petroleum Company (BAPCO) (John S Black; Roger Anthony Kennedy; Milton H Lipp; Ward P Anderson).

The file includes:

Extent and format
1 file (340 folios)
Arrangement

The file’s contents are arranged in approximate chronological order, from the earliest item at the front to the latest at the end. The file notes at the end of the file (ff 326-341) mirror the chronological arrangement.

Physical characteristics

Foliation: the main foliation sequence (used for referencing) commences at the front cover with 1 and terminates at the back cover with 342; these numbers are written in pencil, are circled, and are located in the top right corner of the recto The front of a sheet of paper or leaf, often abbreviated to 'r'. side of each folio. Two additional foliation sequences are also present in parallel between ff 3-341; these numbers are also written in pencil, and are located in the same position as the main sequence.

A previous foliation sequence, which is also circled, has been superseded and therefore crossed out.

Written in
English in Latin script
View the complete information for this record

Use and share this item

Share this item
Cite this item in your research

‘File 28/1 K I Defence of oil field and refinery’ [‎262r] (523/684), British Library: India Office Records and Private Papers, IOR/R/15/2/661, in Qatar Digital Library <https://www.qdl.qa/archive/81055/vdc_100025780134.0x00007c> [accessed 1 August 2026]

Link to this item
Embed this item

Copy and paste the code below into your web page where you would like to embed the image.

<meta charset="utf-8"><a href="https://www.qdl.qa/en/archive/81055/vdc_100025780134.0x00007c">‘File 28/1 K I Defence of oil field and refinery’ [&lrm;262r] (523/684)</a>
<a href="https://www.qdl.qa/en/archive/81055/vdc_100025780134.0x00007c">
	<img src="https://iiif.qdl.qa/iiif/images/81055/vdc_100000000241.0x000036/IOR_R_15_2_661_0523.jp2/full/!280,240/0/default.jpg" alt="" />
</a>
IIIF details

This record has a IIIF manifest available as follows. If you have a compatible viewer you can drag the icon to load it.https://www.qdl.qa/en/iiif/81055/vdc_100000000241.0x000036/manifestOpen in Universal viewerOpen in Mirador viewerMore options for embedding images

Use and reuse
Download this image